Challenger · By Auto Lift Services

Challenger CL12A 12K 2-Post

$11,469.96
Base · before accessories
1 Height
2 Speed & Controls
3 EV-ready package
4 Galvanized arms
5 Color
Min Ceiling13’10”
Slab4” / 3,500 PSI
Electrical208-230V / 1Ph / 20A
Air SupplyNot Required
Download Preparation Checklist
Delivery Options

Compatible Accessories

Only accessories that fit the Challenger CL12A 12K 2-Post are shown. Checked items add to your order total.

EV Lifting Pads
Set of 4 polymer pads for safely lifting electric vehicles.
+$1,059.38
Tesla Lifting Pads
Set of 4 pads designed specifically for Tesla vehicles.
+$1,015.00
Replacement Footpad
CL12A-specific replacement footpad. Sold individually.
+$103.00
Replacement 3-Inch Stack Adapter
Replacement 3-inch stack adapter. Sold individually.
+$58.00
Replacement 6-Inch Stack Adapter
Replacement 6-inch stack adapter. Sold individually.
+$90.00
Air & Electric Workstation
Mounts 110V and compressed-air outlets directly to the lift column.
+$919.93
Turf Rail
For lifting turf equipment and off-road vehicles. 7,000 lb capacity.
+$7,399.17
Emergency Lowering Hand Pump
Manual hand pump for lowering a lift during a power outage or pump failure. When a lift is on the locks it needs to go up before it can come down - this gets the car down safely without power.
+$1,241.57
Setup Total · Lift + Selected Accessories $11,469.96

Quote, Spec Sheet, and Preparation Checklist

Print this for your install crew or your budget meeting.

Your Configuration

Lift modelChallenger CL12A — 12K 2-Post Lift
ConfigurationChallenger CL12A 12K 2-post lift, standard column (13’10” min ceiling), standard speed and controls, finished in Black
Voltage208-230V single phase
Capacity12,000 lb
ALI CertifiedYes
Lift price$11,469.96
Estimated total$11,469.96
FreightIncluded
Quote valid30 days

Bay Requirements

Ceiling height needed13’10”
Bay width (minimum)12’ 6”
Bay depth (recommended)24’

Concrete spec

  • 4” minimum thickness, 3,500+ PSI compressive strength
  • Steel-reinforced, cured at least 28 days
  • Level within 3/8” over the install area
  • No anchor placement within 8” of any crack, edge, or expansion joint

Air supply: Not required (CL12A uses mechanical lock release)

Electrical: 208-230V single-phase, dedicated 20A breaker (see Electrical block below)

We’ll ship you our concrete test tool so you can verify your slab before you commit. $250 deposit is fully refundable when you return the tool within 30 days. You cover return shipping.

Pad Heights — How Low Can You Go?

Minimum pad height determines whether a lift can pick up low-profile vehicles. Lower is better for sports cars and lowered vehicles.

CL12A5” min – 12-5/8” max (with included 6” stack adapter)
CL10AV3 (arms)3-7/8” min – 6-1/8” max
VLE104-1/4” min – 6-3/4” max
CLFP94” min – 6” max

Install Coordination & Rough Ballpark

Typical installer cost for this lift: $1,300 – $1,800

What that ballpark covers: standard install on a clean slab with electrical already run to the bay.

What it does NOT cover:

  • Removing your existing lift
  • Moving equipment that’s currently attached to the lift you’re replacing
  • Electrical work (separate licensed electrician — see Electrical block)
  • Concrete repairs or new pad pour
  • Location-driven variation (rural deliveries, urban access, multi-floor, etc.)

Two paths:

(a) Find your own installer. We can refer one in your area — call us if you need a recommendation. You’ll handle scheduling and payment direct with the installer.

(b) Let us coordinate the install.

We schedule the installer, handle warranty registration after install, and do a post-install inspection. The $499 deposit is applied to your final install bill. If we can’t find an installer in your area, the deposit is fully refunded.

What to Watch Out For

Above the lift — check at the FRONT and REAR of where the vehicle will land, not just over the columns.

The vehicle’s hood and trunk extend past the lift columns when raised. Anything mounted to the ceiling in those zones can hit the vehicle before the lift reaches full rise.

Look for:

  • Garage door opener motor + the door panels themselves when the door is fully open
  • Exhaust ventilation hoods or snorkels
  • Shop lights and fixtures
  • Compressed air piping
  • Existing hose reels (especially if you’re replacing an old lift)
  • HVAC ducts, heaters, radiant heaters
  • Roof rafters, beams, mezzanine edges

Below the lift — check the slab where the columns will anchor:

  • Visible cracks within 8” of where anchors will go (deal-breaker)
  • Existing anchor bolt holes from an old lift (require relocation or epoxy filling)
  • Old inground-lift concrete patches — the patch may not be rebarred to the surrounding slab; treat the patch as unreliable
  • In-floor radiant heat — hydronic tubing under the slab can be punctured by anchor drilling. Get utility locates before drilling.
  • Floor drains and how the floor slopes toward them — affects lift positioning
  • Buried electrical conduit — get utility locates
  • Old concrete (20+ years) can have hidden fractures — visible-OK doesn’t mean structural-OK. The concrete test tool catches this.

Rules of thumb:

  • Never reuse existing anchors from a prior lift install.
  • If installing near old anchor holes, pour anchor bolt epoxy into the new hole before driving in the wedge anchor. The epoxy bonds the anchor into compromised concrete that wedge action alone can’t grip.

Electrical Recommendations

The CL12A runs on 208-230V single-phase, 20-amp dedicated circuit.

Hire a licensed electrician for hookup. Most installers are not certified electricians, so plan on the electrical as a separate trade.

One breaker per lift. Running two lifts off one breaker will trip the breaker as soon as both run at the same time, and it makes future service harder. Budget for a dedicated circuit per bay.

Don’t hard-line conduit directly to the lift body. Electricians sometimes run mounting bolts into the lift housing to anchor conduit, which damages internals or makes the lift jump during operation.

Strongly recommended: loose “whip cord” with twist-lock plug, hanging from the ceiling.

Why:

  • Gives you slack if the lift install location ends up a foot off from planned (it happens — concrete inspections, anchor positions, existing equipment can all push the final location around)
  • Eliminates the need for a separate shop disconnect switch on the wall — techs just unplug the pump when servicing
  • Easier to swap out the power unit later without bringing the electrician back